One of the first pieces was the heater box since it had been rebuilt and was ready to go. The next was the fan motor and ducting for the heater and fresh air.
Then came the right front suspension, it was a bit of a challenge by myself but I was able to get it on and secured
In this picture you can see the installed wiring harness and the heat shield. The heat shield for the fire wall is not done, I still have to install some plumbing to the dash and install the break and clutch peddle box befor it can go on.
No comments:
Post a Comment